Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 1—6 of 6 matches for query "18.218.24.49" retrieved in 0.001 sec with these stats:

  • "18" found 33393 times in 13330 documents
  • "218" found 151 times in 140 documents
  • "24" found 32693 times in 13126 documents
  • "49" found 599 times in 475 documents

Above numbers may include documents not listed due to search options.


... 18-26: NASA'S Apollo 10 (AS-505), first lunar orbital mission with complete Apollo spacecraft, was successfully launched from Kennedy Space Center KSC Launch Complex 39, Pad B, at 12:49 ... burn raised apocynthian (orbital high point) to 218.6 mi (351a km) . Lunar Module ... 18 1969 18 May 19 1969 19 May 20 1969 20 May 21 1969 21 May 22 1969 22 May 23 1969 23 May 24 1969 24 ...
... held last March 1958 attended by 61 persons representing 18 industries. Dr. Philip A. Lapp, senior electrical engineer at ... ”, Vol. III, July 1970, p. 49. “Canadian Rocket Society,” “The Globe and Mail” (Toronto), 24 October 1981, p. A-6. Diamond ... Univelt, Inc.: San Diego, 2016), especially pp. 214, and 216-218. Green, Constance McLaughlin and Milton Lomask, “Vanguard: A History” ...
... GmbH: Lorch/Württemburg, May 1995), pp. 18-19; “Hans Herbert Heuter (''sic''.),” Biographical ... Gainesville, 2008), pp. 13-14, 166, 174, 218, 321, ''et. seq''.; Roger E. Bilstein, ... > note 16 Peterson, “Engineering Consent,” p. 49; Peterson, ''Missiles for the Fatherland'', p. ... Stunde ''( Lehrstuhl für Raumfahrttechnik: Munich, 1992), p. 24; Dmitri Marionoff, with Palma Wayne, ''Einstein ...
... 18 Kromer, Hermann, stud. math., , Leonberg, Lindenbergstr. 27 - 19 Kübler, Manfred, stud. math., Backnang, Stuttgarter Str. 89 - 166 Küehn, Werner, Ing., Heidelberg, Bergstr. 29 - 218 Kühme ... Obernbeck-Löhne, Tonwerkstr, 660 - 49 Seidler, Karl, stud. ing., Stuttg. -Feuerbach, Stuttgarter Str, 134 - 222 Seitler, Irene, Dipl. In;., Stuttgart N., Obstgartenweg 24 - 249 Selinger, ...
... -vehicle preparation was authorized. Launch and checkout crews began working a 24-hr-day, 7-day-week schedule, preparing two additional couches and ... 49 days 3 hrs 38 min 36 sec, set in June by Charles Conrad , Jr., on Skylab 2 . EVA-3 began at 7:18 ... local vertical data runs and 5 solar inertial data runs, completing 218 of the 386 earth resources task sites. All medical experiments were ...
... : d0e5f5" Patent - 1 Media:US24468.pdf No. 24,468. "Improvement in Exhibition Rocket"; granted to ... Mass. - 14 Media:US218394.pdf No. 218,394. “Improvement in Rockets"; granted to Charles Morris, ... to John T. Hadfield, of Middletown, Conn. - 18 Media:US379970.pdf No. 379,970. “Rocket"; ... granted to Dmitri Riabouchinski, of Guethary, France. - 49 Media:US1645427.pdf No. 1, ...

Additional database time was 0.117 sec.

 
Search in namespaces:

















Powered by Sphinx
Views