Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 1—10 of 14 matches for query "3.15.139.250" retrieved in 0.001 sec with these stats:

  • "3" found 42922 times in 14882 documents
  • "15" found 36664 times in 13784 documents
  • "139" found 191 times in 162 documents
  • "250" found 1313 times in 1259 documents

Above numbers may include documents not listed due to search options.


... injection into orbit, radio command from earth activated the 250-lb nuclear reactor by moving internal shielding ... AEC Release H-60; U.S. Aeron. & Space Act., 1965, 139; Atomic Energy Programs, 1965, 151)'' NASA Nike-Apache ... an American on the moon." ''(SR, 4/3/65, 45-48)'' Sen. J. W. Fullbright (D- ... Apr 13 1965 13 Apr 14 1965 14 Apr 15 1965 15 Apr 16 1965 16 Apr 17 1965 17 ...
... S-IVB combination was placed in a phasing orbit with 224-km (139.2-mi) apogee and 150-km (93.2-mi) perigee at ... 3:50. The service propulsion system engine made the deorbit maneuver at 5:38 pm EDT and the CM splashed down upside down at 6:20 pm EDT 400 km (250 ... Garriott. In the first mission to man the Orbital Workshop May 15-June 22, Skylab 2 astronauts had conducted medical, solar, and earth ...
... a $139,000 follow-on contract to Martin Marietta Corp. to study ... contract followed one let in February 1984 and valued at $250,000 to examine the basic "propellant scavenging" concept. The ... Jul 1 1985 1 Jul 2 1985 2 Jul 3 1985 3 Jul 4 1985 4 Jul 5 1985 5 Jul 6 ... 1985 12 Jul 13 1985 13 Jul 14 1985 14 Jul 15 1985 15 Jul 16 1985 16 Jul 17 1985 17 Jul ...
... formation and strength in metals. (NASA Release 85-139) NASA announced that U.S., French, West German ... an integrated processing system capable of a sustained 250 million floating-point, operations-per-second processing ... Oct 1 1985 1 Oct 2 1985 2 Oct 3 1985 3 Oct 4 1985 4 Oct 5 1985 5 ... Oct 13 1985 13 Oct 14 1985 14 Oct 15 1985 15 Oct 16 1985 16 Oct 17 1985 17 ...
... early to assess the effect on Skylab 3 and 4 missions, planned for 56 days each. On May 15 Skylab faced a new threat as ... / S-IVB combination was placed in a phasing orbit with 224-km (139.2-mi) apogee and 150-km (93.2-mi) perigee 9 min ... panel to recharge it, decreasing the total Workshop power by 6%, or 250 w, leaving 4200 w. The Workshop required 3600 w for maintenance, leaving ...
... final decisions on fu­ture production. ''(NASA Release 68-139; W Post, 8/3/68, A2)'' At press showing in Dover, Del., ... Kapton to protect against micrometeoroids and temperatures between 310° F and -250° F. Intermediate garment contained ventilation unit which, for astronauts participating ... air up to one minute. ''(ARC Astro­gram, 8/15/68, 3)'' Data collected for 17 mo by five Lunar Orbiters ...
... award - SpaceX comes to London 76-78 - - '''VOL. 54 No. 3''' '''March 2012''' - The Mighty Atlas Part 1: Early Days ... a proposal to send astronauts to an asteroid. 137-139 - NASA Rewrites its Future An analysis of the all ... hot from Washington DC 250-251 - Satellite Digest – 474 April 2012 252-253 - ISS Operations Summary – 15 March to 15 April 2012 268-270 - ...
... . ing., Nürnberg, Reichenberger Str. 6 - 250 Schmidt, Lee, Dipl. Ing., Berlin W 15, Olivaer Platz 7 - 103 Schneider, Horst ... Realschulstr. 5 - 263 Weirich, Hugo, Dr., Stuttgart W, Silcherstr. 3, II - 115 Weiss, Hans, Augsburg, Rosrenaustr. 38 - ... 60 Zickeli, Kurt, Dipl. Ing., Biberach(Riß) ‚Weingartenweg 14 - 139 Zucker, Walter, stud. ing., Braunschweig, Mastbruch 137 - 216 ...
... of $750 million for Government support of the project, with $250 million additional to come from the aircraft industry, and with ... F-104 , Jet Star, and X-15 , at NASA Flight Research Center. ''(NASA Release 63-139; FRC Release 13-63)'' Media:MA09_ ... . for production of re-entry vehicles was announced by DOD. $1.3 million contract was awarded by AFSC Ballistic Systems Div. ''(DOD Release ...
... First aeronomy satellite, EXPLORER XVII, was launched April 3, 1563. Results included first direct measurement of ... at achieving this objective. ''(NASA Releases 66-96, 66-139; AP, Wash. Post, 5/26/66, E17; WSJ, ... of nonflight experimental model of a 1,250-sq.-ft. deployable solar panel assembly which would ... May 13 1966 13 May 14 1966 14 May 15 1966 15 May 16 1966 16 May 17 1966 17 ...

Additional database time was 0.046 sec.


Result page: 1  2 
 
Search in namespaces:

















Powered by Sphinx
Views