Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 1—10 of 310 matches for query "Jackass_Flats,_Nev" retrieved in 0.000 sec with these stats:

  • "jackass" found 40 times in 37 documents
  • "flat" found 290 times in 242 documents
  • "nev" found 109 times in 105 documents



... operation, including 3.5 min at full thrust, and validated test stand No. 1 in Jackass Flats, Nev. Systems for Nuclear Auxiliary Power 27 SNAP-27 generator was used as electrical power source ...
... , designated the Kiwi B-4D, at near full design power for approximately one minute, at Jackass Flats, Nev . The test used liquid hydrogen as a propellant and coolant with a liquid-hydrogen-cooled ...
... , 229)'' NASA and AEC successfully completed intermediate power run of Phoebus 2A nuclear reactor at Jackass Flats, Nev. Level of approximately 2,000 mw, highest achieved in program to date, was held about ...
... /15/68)'' Phoebus 2A nuclear rocket reactor was successfully tested by NASA and AEC at Jackass Flats, Nev. During 32-min ground test, reactor reached peak power level of approximately 4,200 mw ...
... was smooth. Duration of the test was limited by the liquid hydrogen capacity of the Jackass Flats, Nev., facility. ''(SNPO ; Wash. Post, 8/29/64)'' August 28: Dr. George E. Mueller , NASA Associate ...
... Kiwi-TNT (Transient Nuclear Test) was successfully completed at Jackass Flats, Nev . This was a safety test to verify predictions of behavior of graphite nuclear reactor during ...
... would design, develop, test, and deliver three nozzles to the Nuclear Rocket Development Station at Jackass Flats, Nev . Phase II would be awarded as an incentive contract with an estimated value of $10 ...
NASA-AEC successfully performed a restart of the NRX A-3 Nerva experimental engine at Jackass Flats, Nev . The firing lasted for 18 min, including 13 min, at the engine's full power ...
... project to develop a nuclear rocket, was restarted and operated for the third time at Jackass Flats, Nev . Total operating time was 4.5 min., including about 7 min. at more than 40 ...
... required to design, develop, test and deliver three nozzles to the Nuclear Rocket Development Stand, Jackass Flats, Nev ., by the end of 1967. The contract would be under management of the joint AEC ...

Additional database time was 0.040 sec.


Result page: 1  2  3  4  5  6  7  8  9  10  Next 
 
Search in namespaces:

















Powered by Sphinx
Views