Sept 2 1975

From The Space Library

(Difference between revisions)
Jump to: navigation, search

RobertG (Talk | contribs)
(New page: Marshall Space Flight Center announced the award of a $4 409 000 cost-plus-incentive-fee contract to Bendix Corp. for design, development, test and evaluation, and fabrication of i...)
Newer edit →

Current revision

Marshall Space Flight Center announced the award of a $4 409 000 cost-plus-incentive-fee contract to Bendix Corp. for design, development, test and evaluation, and fabrication of integrated electronic assemblies (IEA) for Space Shuttle Solid Rocket Boosters on the first six Shuttle developmental flights. Each booster would require two LEAs: The forward IEA would initiate release of the nose cap and frustum, jettison the solid-rocket-motor nozzle, detach the parachute, and turn on recovery aids. The aft IEA would interface with the Orbiter, the forward IEA, and other avionic systems. Delivery of the IEAs would begin in 1976 and continue through 1 Apr. 1979. (MSFC Release 75-190)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30