Feb 5 1982

From The Space Library

(Difference between revisions)
Jump to: navigation, search

RobertG (Talk | contribs)
(New page: NASA announced a week-long series of Shuttle checks to verify readiness for launch. Prime and backup crew members would fly a mock liftoff, return to launch site, and descend from orbit to...)
Newer edit →

Revision as of 00:04, 9 February 2010

NASA announced a week-long series of Shuttle checks to verify readiness for launch. Prime and backup crew members would fly a mock liftoff, return to launch site, and descend from orbit to a simulated landing on the dry lake bed at Edwards Air Force Base, California. The first 99 hours would be checkout of individual orbiter systems (electrical distribution, environmental-control, instrumentation, flight control, and propulsion), the external tank (power, instrumentation, range safety, and tumble-valve systems), and solid-fuel rocket boosters (hydraulic, electrical, instrumentation, and range-safety systems) as well as critical electrical and mechanical connections between Shuttle elements.

The second part of the tests would simulate portions of the mission, the launch, a return-to-launch-site abort with the orbiter's system in control, and descent from orbit. (NASA Release 82-19)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28