Oct 22 2002

From The Space Library

(Difference between revisions)
Jump to: navigation, search

RobertG (Talk | contribs)
(New page: NASA announced that it would delay the selection of designs for the RLV that would replace the Space Shuttle under the US$4.8 billion SLI program. NASA had planned to select a pool of ...)
Newer edit →

Current revision

NASA announced that it would delay the selection of designs for the RLV that would replace the Space Shuttle under the US$4.8 billion SLI program. NASA had planned to select a pool of proposed designs in November 2002, eventually limiting the pool to two designs before 2006. However, a NASA official said that NASA had slowed the selection process while awaiting the results of studies on various unresolved issues with the SLI program. The results of those studies could affect the program's objectives, as well as the design of the RLV that NASA planned. (Gwyneth K. Shaw, “NASA Taps Brakes on Shuttle Replacement,” Orlando Sentinel (FL), 23 October 2002.)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31