Nov 26 2007
From The Space Library
RobertG (Talk | contribs)
(New page: ISS Commander Peggy A. Whitson and Flight Engineer Daniel M. Tani conducted their third spacewalk in 15 days, to connect a second set of ammonia-coolant lines to the [[Harmony]...)
Newer edit →
Revision as of 07:48, 1 November 2012
ISS Commander Peggy A. Whitson and Flight Engineer Daniel M. Tani conducted their third spacewalk in 15 days, to connect a second set of ammonia-coolant lines to the Harmony module, to finish reconnecting the station-to-Shuttle power-transfer system, and to carry out a second inspection of the ISS’s right-side SARJ. According to ISS Flight Director J. Derek Hassmann, the SARJ inspection revealed significant and widespread “race ring damage and particulate that was consistent with the damage Daniel M. Tani observed” in late October. The astronauts also prepared Harmony’s right-side port for the upcoming attachment of the Columbus laboratory. On the ground, JSC flight controllers checked out electrical- and cooling-system connections in preparation for fully activating Harmony.
William Harwood, “Successful Spacewalk Ends as Harmony Activation Proceeds,” Spaceflight Now, 26 November 2007.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30