May 7 1980
From The Space Library
NASA announced selection of two firms, McDonnell Douglas and TRW, to receive parallel $1 million one-year contracts for design-definition studies of 25-kilowatt power systems for the STS. The power systems, using solar energy to support large payloads left in orbit, would be placed in a fixed orbit by the Space Shuttle to provide electric power, heat rejection, attitude control, communications, and data handling for a variety of payloads freeing the Shuttle from extended time in orbit and reducing payload cost per day in orbit. MSFC would manage the study contracts and any follow-on development flight system.. (NASA Release 80-63)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31