Oct 8 1987

From The Space Library

Revision as of 19:33, 20 February 2010 by RobertG (Talk | contribs)
(diff) ←Older revision | Current revision (diff) | Newer revision→ (diff)
Jump to: navigation, search

Because of complications encountered in the nozzle fabrication process, NASA moved the test of the flight configuration of the redesigned Space Shuttle solid rocket motor (SRM) to middle or late December 1987. (NASA Release 87-151)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31