Feb 28 1994

From The Space Library

Revision as of 02:31, 4 March 2010 by RobertG (Talk | contribs)
(diff) ←Older revision | Current revision (diff) | Newer revision→ (diff)
Jump to: navigation, search

The countdown began for the liftoff on March 3 of Shuttle Columbia. Columbia was scheduled for a basic 14-day research flight featuring materials development and protein crystal growth as well as medical experiments. (B Sun, Feb 28/94; AP, Feb 28/94; UP, Feb 28/94; Reuters, Feb 28/94)

NASA announced the addition of Jerry M. Linenger to the crew of the fall 1994 flight of Space Shuttle Discovery. The mission of this flight was scheduled to be complex, including a rendezvous, proximity operations, and a spacewalk; thus crew operations needed to be more efficiently distributed. (NASA Release 94-31)

NASA announced that Marshall Space Flight Center, Huntsville, Alabama, was to develop and manufacture an improved, lighter version of the Space Shuttle External Tank. The Super Lightweight External Tank was to be made of aluminum alloys and weigh 8,000 pounds less than the current model. (NASA Release 94-32; AP, Feb 28/94; Defense Daily, Mar 1/94)

NASA's Lewis Research Center, Cleveland, Ohio, announced the selection of Robert P. Madison International for an engineering, construction, and environmental services contract at the Lewis Research Center and at Plum Brook Station, Sandusky, Ohio. (NASA Release C94-i; Defense Daily, Mar 1/94)

A ceremony held at NASA's Dryden Flight Research Facility marked its return to its former status as an independent NASA center. For 13 years it was administered by NASA's Ames Research Center in Moffett Field, California, and designated a facility. Kenneth J. Szalai, formerly deputy director of Ames Research Center for Dryden, was named Dryden director. (Antelope Valley Press, Mar 1/94)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28