Jun 26 2012

From The Space Library

Revision as of 15:23, 21 March 2014 by RobertG (Talk | contribs)
(diff) ←Older revision | Current revision (diff) | Newer revision→ (diff)
Jump to: navigation, search

RELEASE: 12-214 THRUSTER TESTS COMPLETE FOR NASA PARTNER BOEING'S CREW CAPSULE

CANOGA PARK, Calif. -- Pratt and Whitney Rocketdyne has successfully completed a series of tests on a thruster destined for Boeing's Commercial Space Transportation spacecraft, designated CST-100. Boeing is one of several companies working to develop crew transportation capabilities under the Commercial Crew Development Round 2 agreement with NASA's Commercial Crew Program. The goal of the program is to help spur innovation and development of safe, reliable and cost-effective spacecraft and launch vehicles capable of transporting astronauts to low Earth orbit and the International Space Station. Twenty-four thrusters will be part of the spacecraft's orbital maneuvering and attitude control system (OMAC), giving the CST-100 the ability to maneuver in space and during re-entry. The thrusters also will allow the spacecraft to separate from its launch vehicle if an abort becomes necessary during launch or ascent. "Boeing and Pratt and Whitney Rocketdyne know what it takes to develop safe systems and subsystems," said NASA Commercial Crew Program Manager Ed Mango. "They're building on the successes of their past, while pushing the envelope with next-generation ideas to create a spacecraft for low Earth orbit transportation." During tests conducted at the White Sands Space Harbor in Las Cruces, N.M., an OMAC thruster was fired in a vacuum chamber that simulated a space-like environment of 100,000 feet. The tests verified the durability of the thrusters in extreme heat, evaluated the opening and closing of its valves and confirmed continuous combustion and performance. "We're excited about the performance of the engine during the testing and confident the OMAC thrusters will affordably meet operational needs for safe, reliable human spaceflight," said Terry Lorier, Pratt and Whitney Rocketdyne's Commercial Crew Development program manager. All of NASA's industry partners, including Boeing, continue to meet their established milestones in developing commercial crew transportation capabilities. NASA also is developing the Orion spacecraft and Space Launch System (SLS), a crew capsule and heavy-lift rocket that will provide an entirely new capability for human exploration beyond low Earth orbit. Designed to be flexible for launching spacecraft for crew and cargo missions, SLS and Orion will expand human presence beyond low Earth orbit and enable new missions of exploration across the solar system.

RELEASE: 12-215 HOUSTON WORKSHOP MARKS KEY STEP IN PLANNING FUTURE MARS MISSIONS

WASHINGTON -- A recent workshop conducted for NASA by the Lunar and Planetary Institute (LPI) in Houston, marked a key step in the agency's effort to forge a new Mars strategy in the coming decades. A report that summarizes the wide range of cutting-edge science, technology and mission concepts discussed is available online. Held in Houston June 12-14 and attended by scientists and engineers worldwide, the meeting was held to seek ideas, concepts and capabilities to address critical challenge areas in exploring the Red Planet. Discussions provided information for reformulating NASA's Mars Exploration Program (MEP) to be responsive to high-priority science goals and the challenge of sending humans to Mars orbit in the 2030s. Participants identified a number of possible approaches to missions that can be flown to Mars in the coming decade that would make progress toward returning Martian samples -- a top priority of the Planetary Science Decadal Survey -- and make significant advances in scientific understanding of the planet, developing key technologies and advancing knowledge necessary for human exploration on and around Mars. NASA's Mars Program Planning Group (MPPG), tasked with developing options for a reformulated MEP, will consider the workshop inputs in addition to budgetary, programmatic, scientific and technical constraints. "Scientists and engineers came together to present their most creative ideas for exploring Mars," said John Grunsfeld, an astronaut, astrophysicist and associate administrator for NASA's Science Mission Directorate at NASA Headquarters in Washington. "Great ideas come from challenging the best and brightest and igniting their passion and determination to succeed." The MPPG reports to Grunsfeld, who chairs the agency-wide Mars reformulation effort along with William Gerstenmaier, NASA's associate administrator for Human Exploration and Operations Mission Directorate, Chief Scientist Waleed Abdalati and Chief Technologist Mason Peck. The official draft MPPG report is expected to be delivered to NASA for review at the end of the summer. Concepts put forth tapped into significant benefits that could be gained from technology investments by NASA's Science Mission Directorate, Human Exploration and Operations Mission Directorate, and Office of the Chief Technologist. The participants also stressed the importance of establishing international collaboration early in the planning process and sustaining it throughout future missions. "Future Mars exploration missions will require new concepts and technologies," said Michael Gazarik, director of NASA's Space Technology Program. "There were many innovative and transformational concepts presented at the workshop. With continued investments in cutting-edge technology, these will lead to increased capability, reduced mission risk and lower mission costs." Workshop attendance included almost 200 scientists, engineers and graduate students from academia, NASA centers, federal laboratories, industry, and international partner organizations. More than 1,600 people participated online as the workshop proceedings were streamed live on the Internet. "The LPI workshop provided a broad set of ideas for Mars exploration, including synergies between science, human exploration and technology development," Gerstenmaier said. "The number of workshop participants demonstrates the broad interest in Mars exploration." The workshop provided a forum for broad community input on near-term mission concepts. Ideas for longer-term activities will be used to inform program architecture planning beyond the early 2020s. Workshop results represent individual perspectives from members of the scientific and technical community. "The scientific and technical community has given us quite a range of ideas to consider in reformulating the Mars Exploration Program," said Doug McCuistion, director of NASA's Mars Exploration Program at the agency's headquarters. "Many concepts presented are highly relevant to the challenges the MPPG must address." NASA will land its most advanced rover, Curiosity, on the surface of Mars in August. This mobile science laboratory will assess whether the past or present environment on Mars could support life. In 2013, NASA will launch the Mars Atmosphere and Volatile Evolution orbiter, the first mission devoted to understanding the Martian upper atmosphere.

CONTRACT RELEASE: C12-027 NASA ADDS ORBITAL'S ANTARES TO LAUNCH SERVICES II CONTRACT

CAPE CANAVERAL, Fla. -- NASA has modified its NASA Launch Services (NLS) II contract with Orbital Sciences Corporation of Dulles, Va., to add the Antares launch vehicle, formerly known as Taurus II, for future missions. The NLS II on-ramp provision provides an opportunity annually for launch service providers not presently under NLS II contract to compete for future missions, and allows launch service providers already under contract to introduce launch vehicles not currently on their NLS II contracts, such as Antares. NLS II contracts are multiple award, indefinite delivery/indefinite-quantity contracts with ordering periods through June 2020. The contracts provide for a minimum capability of delivering agency payloads weighing approximately 550 pounds or more to a minimum 124-mile-high circular orbit with a launch inclination of 28.5 degrees. The launch service providers also may offer a range of vehicles to NASA to meet higher payload mass and orbit requirements. These contracts support the goals and objectives of the agency's Science Mission Directorate, Human Exploration and Operations Mission Directorate, and Office of the Chief Technologist. Under the contract, NASA also can provide launch services to other government agencies, such as the National Oceanic and Atmospheric Administration. The Launch Services Program Office at NASA's Kennedy Space Center in Florida is responsible for program management.