Jan 22 1988
From The Space Library
EG&G Florida, Inc. was awarded a $635,529 contract to make modifications to the Space Shuttle Landing Facility (SLF). This work would include grinding a 3,500-foot section at each end of the runway to smooth the surface texture, removing cross grooves and adding longitudinal "corduroy grooving." Additionally, existing landing zone light fixtures were to be modified and markings on the entire runway and overruns repainted. These modifications were intended to enhance landing safety by reducing Space Shuffle orbiter tire wear during landing operations. The SLF is 15,000 feet long and 300 feet wide, with a 1,000-foot paved safety overrun at each end. Work was scheduled to begin January 26 and be completed by mid-March 1988. (NASA Release 88-10)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31