Aug 3 2006

From The Space Library

Jump to: navigation, search

During a 6-hour spacewalk, ISS crew members Jeffrey N. Williams and Thomas A. Reiter completed both scheduled tasks and additional assignments. The scheduled tasks included installation of a device to minimize hazards associated with electrical currents and replacement of a computer on the ISS’s S1 truss. In addition, the astronauts installed new samples of materials for the Materials on International Space Station Experiment (MISSE), an ongoing experiment studying how prolonged exposure to an outer space environment affects various materials. The additional tasks included the removal of a malfunctioning GPS antenna and the installation of a vacuum-system valve on the station’s Destiny laboratory, among other projects.

NASA, “International Space Station Status Report: SS06–036,” status report SS06-036, 3 August 2006, http://www.nasa.gov/home/hqnews/2006/aug/HQ_SS06036_ISS_status_report.html (accessed 15 March 2010).

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31