Jan 11 2008

From The Space Library

Jump to: navigation, search

Alliant Techsystems of Edina, Minnesota, announced that Lockheed Martin Space Systems had awarded Alliant a contract to build electricity-generating solar arrays for NASA’s Orion spacecraft. Because solar arrays are expendable, the contract, valued at over US$50 million, could extend at least through 2020. NASA had designed Orion for use in human space exploration and for transporting crews and cargo to the International Space Station (ISS). NASA had chosen Lockheed as the lead contractor for the Orion program in summer 2007.

Salt Lake Tribune (UT), “Alliant To Build Solar Panels for NASA,” 11 January 2008; Erik Borg, “Alliance Gets $50 M NASA Solar-Array Contract,” Minneapolis/St. Paul Business Journal (MN), 11 January 2008.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31