Jan 12 1998

From The Space Library

Jump to: navigation, search

Pressure in Mir's Kvant-2 module had been dropping steadily, to about three-quarters of the normal atmospheric pressure of Earth, indicating that the hatch was still not closing properly. Despite these problems, the team delayed further repairs, scheduling them to take place after other planned events, including a spacewalk scheduled for later in the week, the docking with Space Shuttle Endeavour planned for 25 January, and the arrival of a Russian-French team on 30 January.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31