Jun 17 1975
From The Space Library
Kennedy Space Center announced the award of a $1612 948 extension to a $600 000 contract to Reynolds, Smith, and Hills Co. for Space Shuttle architectural and engineering services. The contract, which would run until June 1977, provided for modification to Pad A and Mobile Launcher 3 at Launch Complex 39, both being reconfigured for the Space Shuttle. (KSC Release 109-75)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30