Apr 18 1978
From The Space Library
NASA announced award of a $5 million contract to Vought Corporation, Dallas, Tex., for 5 Scout launch vehicles and associated hardware, such as separation systems and heat shields. Vought had been the Scout project's prime contractor since 1959. The first Scout, designed to place a 130-lb payload into a 300-nautical-mi circular earth orbit, had been launched in 1960. The new Scout could launch a 4041b payload from Wallops Island, Va.; Vandenberg Air Force Base, Calif.; or San Marco offshore at Kenya, Africa, into that orbit. The latest configuration of Scout vehicles was known as Phase 8; phases 1 through 7 had produced 107 vehicles, 96 of which had been launched. (NASA Release 78-20)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30