Mar 12 2002

From The Space Library

Jump to: navigation, search

Space Shuttle Columbia STS-109 landed at NASA’s KSC in Cape Canaveral, Florida, at 4:32 a.m. (EST). During the 11-day mission, the Shuttle crew had conducted five spacewalks and performed several significant modifications of the HST, including the installation of an ACS and an experimental cryocooler, which had restored the operation of the NICMOS. The mission’s total duration was 10 days, 22 hours, and 11 minutes. (NASA, “STS-109,” http://science.ksc.nasa.gov/shuttle/missions/STS-109/mission-STS-109.html (accessed 11 August 2002); Puttkamer, “Space Flight 2002.”

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31