November 1960
From The Space Library
Under arrangements of the AACB (Aeronautics and Astronautics Coordinating Board), NASA will utilize existing NASA tracking stations for initial Centaur development vehicles and switch to the Advent network (which is to be planned, funded, and constructed by DOD) when Centaur is operational, perhaps as early as the fourth of 10 development launchings of Centaur.
- November
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30