Sep 20 2000
From The Space Library
Space Shuttle Atlantis landed at KSC in Cape Canaveral, Florida before dawn, the 15th nighttime landing in the Shuttle program's history. Among the tasks that the crew had completed during the mission were delivering 3 tons (2,700 kilograms or 2.7 tonnes) of supplies for the first permanent crew including toiletries, Russian and American meals, medical kits, and camera equipment and installing the station's toilet, an oxygen generator, a treadmill, and power and television cables. NASA officials had decided to extend the mission an extra day to allow the crew more time to accomplish its work inside the space station. N. Wayne Hale, STS-106 Flight Director, explained that the mission had begun with 52 items on its list of tasks to accomplish, but the number had increased to 74 different tasks, large and small, on board the ISS. The only malfunction during the mission had been that of a newly installed battery, which Russian Mission Control had ordered disconnected when it failed to charge properly.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30