Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 1—9 of 9 matches for query "18.119.119.191" retrieved in 0.001 sec with these stats:

  • "18" found 33393 times in 13330 documents
  • "119" found 319 times in 271 documents
  • "191" found 143 times in 137 documents

Above numbers may include documents not listed due to search options.


... Jersey City, N. J. - 13 Media:US119630.pdf No. 119,630. “Improvement in Rockets"; granted to Cornelius E. Masten, of ... "Rocket"; granted to John T. Hadfield, of Middletown, Conn. - 18 Media:US379970.pdf No. 379,970. “Rocket"; granted to Wilhelm Meissel, ... of Worcester, Mass. - 38 Media:US1191299.pdf No. 1,191,299. “Rocket Apparatus"; granted to Robert H. Goddard, of Worcester, ...
... tested using a Gemini boilerplate. Spacecraft was dropped from a C-119 aircraft at 7,000- ft. altitude. Two 12,000-lb.-thrust ... 12/23/64, 7)'' NASA announced that a 10-month study contract for $191,835 to assess the technological problems of designing, building, and operating ... 15 1964 15 Dec 16 1964 16 Dec 17 1964 17 Dec 18 1964 18 Dec 19 1964 19 Dec 20 1964 20 Dec 21 1964 ...
... by U.S.S.R. into orbit: apogee, 638.7 km. (396 mi,) ; perigee, 191.9 km. (119 mi,); period, 92.6 min.; inclination, 63.5°, Tass said that instrumentation on PROTON ... 1965 14 Nov 15 1965 15 Nov 16 1965 16 Nov 17 1965 17 Nov 18 1965 18 Nov 19 1965 19 Nov 20 1965 20 Nov 21 1965 21 Nov 22 ...
... equipment to continue space investigations, Tass announced. Orbital data: apogee, 226 km. (140 mi.); perigee, 191 km. (119 mi.); period, 88.6 min.; inclination, 51°. ‘‘(Tass, 3/1/66)’’ Edgar M. Cortright ... 1966 14 Mar 15 1966 15 Mar 16 1966 16 Mar 17 1966 17 Mar 18 1966 18 Mar 19 1966 19 Mar 20 1966 20 Mar 21 1966 21 Mar 22 ...
... business had received $119 million (22%) of the $522 million in new contracts worth $10 000 and more with business firms. Small business had also received $496 million (18%) of subcontract awards ... 775; Aerojet Solid Propulsion Co., $3 445 066 (stage two); and Hercules, Inc., $3 493 191 (stage three). A requirement to design explosive ordnance-initiation devices for stage separation and thrust ...
... 170B sounding rocket was launched by NASA from White Sands Missile Range WSMR to 191.5-km (119-mi) altitude on flight performance mission. Rocket and instruments functioned satisfactorily and payload was ... 1971 14 Jul 15 1971 15 Jul 16 1971 16 Jul 17 1971 17 Jul 18 1971 18 Jul 19 1971 19 Jul 20 1971 20 Jul 21 1971 21 Jul 22 ...
... launched from Gillam, Manitoba, carried a 63.5-kg (140.0-1b) payload to 191.7 km (119.1 mi) to investigate plasma prop­erties of upper-atmosphere radio aurora plasma. Black ... 1973 14 Feb 15 1973 15 Feb 16 1973 16 Feb 17 1973 17 Feb 18 1973 18 Feb 19 1973 19 Feb 20 1973 20 Feb 21 1973 21 Feb 22 ...
... 146 hours, 3 minutes and 51 seconds. On STS-34 (October 18 to October 23, 1989) The crew aboard space shuttle Atlantis ... Center and landed at Edwards Air Force Base . Mission duration was 119 hours and 41 minutes and was accomplished in 79 orbits of ... first Tethered Satellite System (TSS) test flight. Mission duration was 191 hours, 16 minutes and 7 seconds. Space shuttle Atlantis and ...
... = Payload Mass Up = 11175.6 kg Payload Mass Down = 4763.18 kg Orbiter = Endeavour Lift Off Mass = 2,054,091. ... Kennedy Space Center, Fla. Orbits of Earth = 248 Orbital Altitude = 191 nautical miles Crew '''Commander: Mark L. Polansky''' '''Pilot: Douglas G. ... P3 truss that had failed to unfurl during STS-119. EVA 2, 6 hours, 53 minutes; Wolf and Marshburn ...

Additional database time was 0.040 sec.

 
Search in namespaces:

















Powered by Sphinx
Views