Search wiki using Sphinx
From The Space Library
Displaying 1—8 of 8 matches for query "3.139.69.53" retrieved in 0.001 sec with these stats:
- "3" found 42922 times in 14882 documents
- "139" found 191 times in 162 documents
- "69" found 3167 times in 1188 documents
- "53" found 813 times in 541 documents
Above numbers may include documents not listed due to search options.
... was placed in a phasing orbit with 224-km (139.2-mi) apogee and 150-km (93.2-mi ... (IU) was deployed. At 5 hrs 19 min 53 sec after launch the S-IVB /IU deorbit maneuver ... They would be quarantined for one week.
The Skylab 3 mission achieved its primary objectives of performing unmanned Saturn ... the longest cumulative time in space for one man, 69 days for Bean (who had spent 10 days on the ...
... Dreieckproblem
62, 64
-
Anilin
138
-
Anis-Manis 3
138
-
Anlegemanöver
31
-
Antipoden-Raketenflugzeug
51, 53, 54, 69
-
Antrieb
47
-
Anziehungskräfte, Newtonsche
4
- ... --
39
-
Druckminderer
11
-
Druck, Statischer -
108
-
Dural
137, 139
-
Durant, F. C.
97, 98
-
Durchlaufstrahltriebwerk
69
-
Ecktransversale
61
-
Eigengravitation der A.-S.
103
-
...
... Mars
139
-
Grundgleichung der Rakete
37, 62, 145
-
Gütegrad des Raketen-motors
2, 3 ...
Nullmeridian
76
-
Oberflächenreibung
9
-
Oberth, Hermann
17, 69, 99
-
Oberth-Raketen
4
-
Osterreichische Gesellschaft ... 26
-
Raumnavigation
54
-
Raumstrahltriebwerke
2
-
Reflexionsfaktor
52, 53
-
Reflexionsvermögen einer Gassäule
51
-
Registrierballone
13
-
Reibungswiderstand
...
... Gibson’s ''Neuromancer '' (1984). ref 69 It was inspired by contemporary and ... and reflective -- philosophical. ref 105
2.3.3. Astrophotography as Space Art
Astrophotographs -- photographs ... '' . Boston: Kluwer Academic Publishers, 2000, pp. 53-90
note 95 Francesca Rochberg, ... see no gap” (Hartmann, ''op cit'' ., pp. 134-139).
note 125 The Arts Catalyst ...
... CSM/ S-IVB combination was placed in a phasing orbit with 224-km (139.2-mi) apogee and 150-km (93.2-mi) perigee 9 min 56 ... drop slowly, reaching 304 K (88°F). At 8:50 pm EDT a 69-sec trim burn put the Workshop into a repeating ground track about 96 ... before reentering the Workshop and closing the AM EVA hatch at 2-53 PM EDT, concluding 3 hrs 30 min successful EVA.
The Workshop was pitched up to ...
... Technology Satellite
David Dooling, Jr.
53
-
The Skylab Student Project
P. J. Parker
57
-
Space Report
60
-
High Performance Sounding Rocket
69
-
The Apollo 15 Investigation
...
CETI Questionnaire
137
-
Terrestrial Biochemistry in Perspective
Dr. P. M. Molton
139
-
The Last Apollo - 3
David Baker
145
-
Space Report
148
-
Mars Unveiled
151
-
...
... background: d0e5f5" Page
-
F. Winterberg
Negative Mass Propulsion
3-16
-
R. Swinney et al
R. Swinney; ... Radioisotopes for Heat and Power Sources
49-53
-
M. Inoue et al.
M. ... Power Sources and Electric Propulsion
63-69
-
M. A. Gibson et al
M. A ... Fuel Encapsulation for Inertial Electrostatic Confinement Nuclear Fusion Reactors
139-149
-
S. M. Geng et al
S. ...
... missions that make Gaia possible.
66-69
-
Patrick Moore — an obituary
Spaceflight ... 50-51
-
Satellite Digest – 481 November 2012
52-53
-
ISS Operations Summary – 16 November to 14 December 2012
... UKSEDS – BIS History Committee
76-78
-
-
'''VOL. 55 No. 3'''
'''March 2013'''
-
Is there an Earth ... Red Planet in August 2012.
138-139
-
Curiosity at Mars
Ken Kremer ...
Additional database time was 0.089 sec.
Powered by Sphinx