Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 1—8 of 8 matches for query "3.139.69.53" retrieved in 0.001 sec with these stats:

  • "3" found 42922 times in 14882 documents
  • "139" found 191 times in 162 documents
  • "69" found 3167 times in 1188 documents
  • "53" found 813 times in 541 documents

Above numbers may include documents not listed due to search options.


... was placed in a phasing orbit with 224-km (139.2-mi) apogee and 150-km (93.2-mi ... (IU) was deployed. At 5 hrs 19 min 53 sec after launch the S-IVB /IU deorbit maneuver ... They would be quarantined for one week. The Skylab 3 mission achieved its primary objectives of performing unmanned Saturn ... the longest cumulative time in space for one man, 69 days for Bean (who had spent 10 days on the ...
... Dreieckproblem 62, 64 - Anilin 138 - Anis-Manis 3 138 - Anlegemanöver 31 - Antipoden-Raketenflugzeug 51, 53, 54, 69 - Antrieb 47 - Anziehungskräfte, Newtonsche 4 - ... -- 39 - Druckminderer 11 - Druck, Statischer - 108 - Dural 137, 139 - Durant, F. C. 97, 98 - Durchlaufstrahltriebwerk 69 - Ecktransversale 61 - Eigengravitation der A.-S. 103 - ...
... Mars 139 - Grundgleichung der Rakete 37, 62, 145 - Gütegrad des Raketen-motors 2, 3 ... Nullmeridian 76 - Oberflächenreibung 9 - Oberth, Hermann 17, 69, 99 - Oberth-Raketen 4 - Osterreichische Gesellschaft ... 26 - Raumnavigation 54 - Raumstrahltriebwerke 2 - Reflexionsfaktor 52, 53 - Reflexionsvermögen einer Gassäule 51 - Registrierballone 13 - Reibungswiderstand ...
... Gibson’s ''Neuromancer '' (1984). ref 69 It was inspired by contemporary and ... and reflective -- philosophical. ref 105 2.3.3. Astrophotography as Space Art Astrophotographs -- photographs ... '' . Boston: Kluwer Academic Publishers, 2000, pp. 53-90 note 95 Francesca Rochberg, ... see no gap” (Hartmann, ''op cit'' ., pp. 134-139). note 125 The Arts Catalyst ...
... CSM/ S-IVB combination was placed in a phasing orbit with 224-km (139.2-mi) apogee and 150-km (93.2-mi) perigee 9 min 56 ... drop slowly, reaching 304 K (88°F). At 8:50 pm EDT a 69-sec trim burn put the Workshop into a repeating ground track about 96 ... before reentering the Workshop and closing the AM EVA hatch at 2-53 PM EDT, concluding 3 hrs 30 min successful EVA. The Workshop was pitched up to ...
... Technology Satellite David Dooling, Jr. 53 - The Skylab Student Project P. J. Parker 57 - Space Report 60 - High Performance Sounding Rocket 69 - The Apollo 15 Investigation ... CETI Questionnaire 137 - Terrestrial Biochemistry in Perspective Dr. P. M. Molton 139 - The Last Apollo - 3 David Baker 145 - Space Report 148 - Mars Unveiled 151 - ...
... background: d0e5f5" Page - F. Winterberg Negative Mass Propulsion 3-16 - R. Swinney et al R. Swinney; ... Radioisotopes for Heat and Power Sources 49-53 - M. Inoue et al. M. ... Power Sources and Electric Propulsion 63-69 - M. A. Gibson et al M. A ... Fuel Encapsulation for Inertial Electrostatic Confinement Nuclear Fusion Reactors 139-149 - S. M. Geng et al S. ...
... missions that make Gaia possible. 66-69 - Patrick Moore — an obituary Spaceflight ... 50-51 - Satellite Digest – 481 November 2012 52-53 - ISS Operations Summary – 16 November to 14 December 2012 ... UKSEDS – BIS History Committee 76-78 - - '''VOL. 55 No. 3''' '''March 2013''' - Is there an Earth ... Red Planet in August 2012. 138-139 - Curiosity at Mars Ken Kremer ...

Additional database time was 0.089 sec.

 
Search in namespaces:

















Powered by Sphinx
Views