Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 1—10 of 23 matches for query "3.145.8.49" retrieved in 0.001 sec with these stats:

  • "3" found 42922 times in 14882 documents
  • "145" found 218 times in 202 documents
  • "8" found 38364 times in 13958 documents
  • "49" found 599 times in 475 documents

Above numbers may include documents not listed due to search options.


... III , broke three records when he entered his eighteen orbit of the earth at 5:49 AM Moscow time, completing 25 hours and 19 minutes of flight time in space and ... : apogee, 141.3 mi.; perigee, 109.7 mi.; period, 88.2 min.; inclination, 64.59 degrees to Equator; VOSTOK IV : apogee, 145.8 mi.; perigee, 110.5 mi.; period, 88.3 min.; inclination, 64 ... 1 Aug 2 1962 2 Aug 3 1962 3 Aug 4 1962 4 Aug 5 1962 5 Aug 6 1962 6 Aug 7 1962 7 Aug 8 1962 8 Aug 9 1962 9 Aug ...
... - Athylalkohol 4 - Atmosphäre 13 - Atomenergie als Raketentreibstoff 141, 145 - Auspuffgeschwindigkeit 2, 3, 4, 37, 40, 144 - Außenstation 30, 33, 45, 88 ... - Ionisierungsgrad in Abgasen 49, 50 - Ionisierungsstörungen 49, 53 - Ionisierung, thermische 50 - Ionosphäre 14 - Ionosphärenrakete 8 - Jahresbericht der GfW 21 - Jahreshauptversammlung, 3. - der GfW 42 - ...
... San Francisco: NF Division, GLB Publishers, 1993 note 8 ''The essential Odyssey'' . Translated and edited by Stanley ... 3, https://en.wikipedia.org/wiki/Chang’e_3 (Last accessed Jan. 24, 2017) note 48 ''Ibid'' ., p. 259 note 49 ... htm> note 87 “100 Tanka Poems Selected from 145,000 Entries. Chiaki Mukai presents awards for completion of ...
... with four "Getaway Special" canisters. STS-8 completed 98 orbits of the Earth in 145 hours before landing at Edwards Air Force Base , California, on September 3, 1983. On his second mission (June ... Additionally, a variety of medical, scientific and operational tests were conducted throughout the mission. STS-49 logged 213 hours in space and 141 Earth orbits prior to landing at Edwards ...
... Volkssternwarte(Heinz Zoch) , München 8, Rosenheimerstr. 145 - 23 Nagel , Manfred, cand. ing., Ludwigsburg, Solitüdestr. 26 - 161 Neubeck, Erich, Koln-Braunsfeld, am Morsdorfer Hof 3 - 48 Neuhauser, Rudolf, ing ... Pasadena, Calif, USA - 231 Seidel, Hans H., Obernbeck-Löhne, Tonwerkstr, 660 - 49 Seidler, Karl, stud. ing., Stuttg. -Feuerbach, Stuttgarter Str, 134 - 222 Seitler, Irene ...
... 7,1962) , Orbiting Solar Observatory OSO II (launched Feb. 3,1965) , and Orbiting Solar Observatory OSO III (launched March 8,1967) by collecting data on solar x-rays, gamma rays, ... launched Cosmos CLXXXIII into orbit with 212-km (132-mi) apogee, 145-km (90-mi) perigee, 89.9-min period, and 49° inclination. Equipment and instruments functioned satisfactorily. Satellite reentered same ...
... Name data2 = Kevin P. Chilton header3 = label3 = Birth Date data3 = Nov 3 1954 header4 = label4 = Birth Place data4 = label5 = Date ... and commanded the 9 th Reconnaissance Wing, 8 th Air Force, Joint Functional ... tests were conducted throughout the mission. STS-49 logged 213 hours in space ... Shuttle for science and education. Following 145 orbits of the Earth, Atlantis ...
... “The German Rockets,” p. 12. note 8 ''Mitteilungen,'' March 1930, p. 3; Jelnina and Rohrwild, p. 43; Ley, ''Missiles, Rockets'', pp. 143-145; Willy Ley, “The End of the Rocket ... Flight,” ''Bulletin, The American Interplanetary Society'', No. 11, August 1931, pp. 2-3; Jelena and Rohrwild, p. 49. note 12 Pendray, “Recent Worldwide,” p. 6. note 13 < ...
... plan, closing hatch by 134:82 GET (2:44 am EST Nov. 20), after 3 hrs 49 min walking on lunar surface in second EVA period. While Lunar Module LM was on ... with 53.3-mi (85.8-km) apolune and 10.1-mi (16.3-km) perilune. Rendezvous maneuvers occurred as planned and Lunar Module LM docked with Command Service Module CSM at 145:36 ... Mauro, Descartes, and Lalande. November 21-24: Crew fired SPS engine at 172:27 GET (3:49 pm EST Nov. 21) , injecting Command Service Module CSM into transearth trajectory after 89 hrs ...
... 15-17: MCC-5 at 145:19 GET, by 15-sec Lunar Module LM DPS burn, decreased velocity by 2.3 m per sec (7.5 ... with 22.4sec Lunar Module LM RCS burn, resulting in predicted -6.49° entry-flight-path angle. Crew viewed and photographed SM when it was ... LM was jettisoned at 141:30 GET. SNAP27 nuclear generator carrying 3.9 kg (8.6 lbs) of radioactive plutonium fell from Lunar Module LM into ...

Additional database time was 0.137 sec.


Result page: 1  2  3 
 
Search in namespaces:

















Powered by Sphinx
Views