Search wiki using Sphinx
From The Space Library
Displaying 1—10 of 71 matches for query "3.15.10.189" retrieved in 0.002 sec with these stats:
- "3" found 42922 times in 14882 documents
- "15" found 36664 times in 13784 documents
- "10" found 47168 times in 17591 documents
- "189" found 119 times in 118 documents
Above numbers may include documents not listed due to search options.
... ( Lunar Module LM pilot), entered initial orbit with 119.5-mi (192.3-km) apogee and 117.6-mi (189.3-km) perigee. After post-insertion checkout Command Service Module CSM , code-named ... when they bring to any task the best of man's mind and heart." ''(PD, 3/10/69, 356)''
After watching Apollo 9 launch at Kennedy Space Center KSC , Vice President Spiro ... 8 Mar 9 1969 9 Mar 10 1969 10 Mar 11 1969 11 Mar 12 1969 12 Mar 13 1969 13 Mar 14 1969 14 Mar 15 1969 15 Mar 16 1969 16 Mar ...
... , 4/6/70; NASA Int Aff; SBD, 3/12/70, 57; SF, 5/ 70,189)''
Subsystem test bed (STB), experimental, low-cost spacecraft module, began 10-day vacuum-chamber test at MSC to ... controlling temperature of future space vehicles. Test would subject STB, which had 4.6-m (15-ft) diameter and 2.7-m (9-ft) height, to temperatures from 200 K to ... 8 Mar 9 1970 9 Mar 10 1970 10 Mar 11 1970 11 Mar 12 1970 12 Mar 13 1970 13 Mar 14 1970 14 Mar 15 1970 15 Mar 16 1970 16 Mar ...
... to the task." '' (Science, 4/3/70, 100)''
Science editorial noted that President's Council of Economic Advisers had projected increase in Federal expenditures from $189 billion in 1970 to $206 billion ... 2 Apr 3 1970 3 Apr 4 1970 4 Apr 5 1970 5 Apr 6 1970 6 Apr 7 1970 7 Apr 8 1970 8 Apr 9 1970 9 Apr 10 1970 10 Apr 11 1970 11 Apr 12 1970 12 Apr 13 1970 13 Apr 14 1970 14 Apr 15 1970 15 Apr 16 1970 16 Apr ...
... Media:77-04-15.pdf Space News for this day. (1MB PDF)
Johnson Space Center JSC announced award of a $5 189 500 supplement to an existing contract with Rockwell International 's ... 2 Apr 3 1977 3 Apr 4 1977 4 Apr 5 1977 5 Apr 6 1977 6 Apr 7 1977 7 Apr 8 1977 8 Apr 9 1977 9 Apr 10 1977 10 Apr 11 1977 11 Apr 12 1977 12 Apr 13 1977 13 Apr 14 1977 14 Apr 15 1977 15 Apr 16 1977 16 Apr ...
... enhance local weather analysis and fore-casting. (NASA Release 94-189)
NASA announced the signing of a collaborative agreement of the ... sand. (Newsday, Nov 15/94)
October 1994 October
November 1994 November
Nov 1 1994 1 Nov 2 1994 2 Nov 3 1994 3 Nov 4 ... 9 Nov 10 1994 10 Nov 11 1994 11 Nov 12 1994 12 Nov 13 1994 13 Nov 14 1994 14 Nov 15 1994 15 Nov ...
... Launch launched a telecommunications satellite Thuraya-2 aboard a Zenit 3-SL rocket. The satellite belonged to Thuraya Satellite Telecommunications ... “NASA Prepares Two Robot Rovers for Mars Exploration,” news release 03-189, 4 June 2003, http://www.nasa.gov/home/hqnews/ ... 9 Jun 10 2003 10 Jun 11 2003 11 Jun 12 2003 12 Jun 13 2003 13 Jun 14 2003 14 Jun 15 2003 15 Jun ...
... Cosmos 638 from Baykonur Cosmodrome into orbit with a 30-km apogee, 189-km perigee, 89.5-min period, and 51.8° inclination. The ... NASA to contract for Tracking and Data Relay Satellite services. ''(CR, 3 April 74, H2584; NASA LAR, XIII/43)''
Indonesia would build a ... 1974 9 Apr 10 1974 10 Apr 11 1974 11 Apr 12 1974 12 Apr 13 1974 13 Apr 14 1974 14 Apr 15 1974 15 Apr 16 ...
... mp4
'''Click here to listen to Apollo 10 Mission audio MET T+189.49 through 191.44 Separation May 26 1969''' ... mp4
'''Click here to listen to Apollo 10 Post flight Press conference Part 3 May 26 1969'''
File:Apollo10690526- ... 9 May 10 1969 10 May 11 1969 11 May 12 1969 12 May 13 1969 13 May 14 1969 14 May 15 1969 15 ...
... booster malfunctioned. Some 189 meteorological sounding rockets, 85 scientific sounding rockets, and 60 high-altitude balloons were launched. NASA-USAF XB-70 and X-15 programs were concluded ... prototype construction was recommended by President Nixon. NASA's HL-10 lifting-body vehicle completed 3 successful glide flights and 15 powered flights included first supersonic flight at mach 1. ...
... rest of mission. Spacecraft entered planned parking orbit with 118-mi (189.9-km) apogee and 115.0-mi (185.0-km) perigee. ... Command Service Module CSM transposing and docking with Lunar Module LM at 3:27 GET and ice on windows from rain frozen during liftoff. ... 1969 9 Nov 10 1969 10 Nov 11 1969 11 Nov 12 1969 12 Nov 13 1969 13 Nov 14 1969 14 Nov 15 1969 15 Nov 16 ...
Additional database time was 0.041 sec.
Result page: | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 |
Powered by Sphinx