Search wiki using Sphinx
From The Space Library
Displaying 1—8 of 8 matches for query "3.15.34.233" retrieved in 0.001 sec with these stats:
- "3" found 42922 times in 14882 documents
- "15" found 36664 times in 13784 documents
- "34" found 2066 times in 1150 documents
- "233" found 75 times in 73 documents
Above numbers may include documents not listed due to search options.
... X-15 research aircraft were conducted; X-15 No. 2 piloted by Maj. William J. Knight set a new record speed of 4,233 mph ... of the 260-in.-dia. solid-propellant rocket motor, producing 3.5 million lbs. of thrust. Two test series of Nuclear ... an eventual worldwide military comsat system. Of the 43 Soviet payloads, 34 were Cosmos satellites and five, Luna spacecraft. Notable among these were ...
...
-
71
Eichler, Ewald, Ing., Dresden A 34, Kohlgraben 5
-
180
Erdmann, Horst, Home ...
269
Krause, Helmut, Dr., Hamburg-Bergedorf, Vierlandstr. 15
-
79
Krebs, Fritz, Stuttgart-Degerloch, Leinfeldenerstr. ... Josef, Dipl. Ing., Postfach, Baden(Schweiz)
-
233
Sternberg, Gerhard, Ing., Vlotho (Weser)
-
... 263
Weirich, Hugo, Dr., Stuttgart W, Silcherstr. 3, II
-
115
Weiss, Hans, Augsburg, ...
... report his findings to Congress in conformance with P.L. 88-113. ''(NASA Release 63-233)''
NASA Administrator James E. Webb , testifying before the Senate Commerce Committee Subcommittee on Aviation, pointed ... during cruise by 3%; Reduce engine weight by 15%; Reduce airframe structure weight by 5%. If all of these gains can be achieved simultaneously the payload can be increased 34% for a given ...
... 233.8 million for Skylab ; $90 million for the Apollo Soyuz Test Project (ASTP) ; $220.2 million for development, test, and mission operations; $21 million for space life sciences; and $15 ... -F) and a Canadian Cooperative Satellite (CAS-C) ; $3 million for a multidisciplinary Earth Observing Satellite (EOS) ... From a peak Civil Service complement of more than 34 000 in 1967, NASA would be reduced ...
... onboard hydrazine thrusters to push satellite into desired synchronous orbit with 35 772.9km (22 233.0-mi) apogee and 35 737.7-km (22 211. l .-mi) perigee at 19 ... which cut $15 million from $692.3-million Administration budget request for research and program management and $2.05 million from $34.6-million Administration request for construction of facilities. Total $3.315 billion NASA authorization recommended by Senate committee was $17.05 million below $3.333 billion Nixon budget ...
... Senate authorization-$30 million above NASA's requested $3.016 billion-would be NASA's lowest ... provide $2.231 billion for research and development, $34 million more than NASA's request but $24 million ... retain Skylab funding at NASA's re-quested $233 million and space shuttle funding at $475 million ... May 13 1973 13 May 14 1973 14 May 15 1973 15 May 16 1973 16 May 17 1973 17 ...
... racing outward at 250 kilometers per second (155.34 miles per second)—560,000 miles per hour (901,233 kilometers per hour) — and generating energy ... November 2009 November
Nov 1 2009 1 Nov 2 2009 2 Nov 3 2009 3 Nov 4 2009 4 Nov 5 2009 5 Nov 6 2009 ... Nov 12 2009 12 Nov 13 2009 13 Nov 14 2009 14 Nov 15 2009 15 Nov 16 2009 16 Nov 17 2009 17 Nov 18 2009 ...
... 68
-
'ESA SCIENTIFIC PROJECTS' COMPETITION.
71
-
-
'''VOL. 38 NO. 3'''
'''MARCH 1996'''
-
Next Steps in Space.
... costs to orbit with their X-34 project described by David Ian Wade.
... -
-
'''VOL. 38 NO. 7'''
'''JULY 1996'''
-
APOLLO-15: MISSION TO THE MOUNTAINS OF ... the new Millennium. Space Miscellany.
233
-
Correspondence.
247
-
BIS NEWS.
249
-
...
Additional database time was 0.040 sec.
Powered by Sphinx