Search wiki using Sphinx
From The Space Library
Displaying 1—10 of 47 matches for query "3.19.68.41" retrieved in 0.001 sec with these stats:
- "3" found 42922 times in 14882 documents
- "19" found 32600 times in 13126 documents
- "68" found 2977 times in 954 documents
- "41" found 803 times in 646 documents
Above numbers may include documents not listed due to search options.
... , had been solved by Zond VI. ''(UPI, W Star, 11/20/68, B11)''
In answer to queries see Nov. 16 DOD issued ... including economic escalation and all other factors, are $3.25 billion and $4.3 billion, indicating increases of 41% and 39% respectively." Additional costs had resulted ... 16 1968 16 Nov 17 1968 17 Nov 18 1968 18 Nov 19 1968 19 Nov 20 1968 20 Nov 21 1968 21 Nov 22 1968 ...
... PDF)
NASA's PEGASUS I meteoroid-detecting satellite recorded 19 wing punctures in its 3 to 4 million mi. travels. Earth-transmitted electronic ... , 3/4/65, 50; AP, Wash. Post, 3/4/65)''
NASA, at DOD's request, had halted Syncom II 's westward drift at 68° ... at very high speeds. ''(3) study effects of vehicles passing through atmosphere at slower speeds, and (41 relate to allied studies that ...
... 41 and STS-4 9, accepted the position of Director, Shuttle Processing Contract Process Improvement Technology with Lockheed Space Operations Co. (LSOC) at Kennedy Space Center , Florida. (NASA Release 92-68; USA Today, May 20/92; AP, May 19/92)
Scientists at ... 19/92)
April 1992 April
May 1992 May
May 1 1992 1 May 2 1992 2 May 3 1992 3 ...
... km ''(372 mi)'' ; period, 97.1 min; and inclination, 81.2°. ''(GSFC SSR, 3/15/68; AP, NYT, 3/20/68, 10)''
Spacecraft for first manned Apollo mission would use 60% oxygen and 40 ... would be in cabin were only slightly affected. ''(NASA Release 68-47; O'Toole, W Post, 3/6/68, 1; UPI, NYT, 3/15/68, 41)''
NASA's Ats III ''(launched Nov. 5, 1967)'', in synchronous ... 1968 15 Mar 16 1968 16 Mar 17 1968 17 Mar 18 1968 18 Mar 19 1968 19 Mar 20 1968 20 Mar 21 1968 21 Mar 22 1968 22 Mar 23 ...
... July 1, 1968, through June 30, 1969. ''( NASA Release 68-116; FRC Release 19-68)''
At signing in Washington, D.C., of nuclear nonproliferation treaty ... guaranteed repayment. Total cost of each aircraft was estimated at $41.2 million, with probable 50% advance payment by airlines required. ... Pm; SBD, 7/8/68, 10)''
July 1968 July
Jul 1 1968 1 Jul 2 1968 2 Jul 3 1968 3 Jul 4 1968 4 ...
... rotation period. ''(NASA Release 68-106; LA Times, 6/16/68; Pasadena Independent Star-News, 6/16/68; Glendale News-Press, 6/18/68; Sullivan, NYT, 6/27/68, 41)''
June 1968 June
Jun 1 1968 1 Jun 2 1968 2 Jun 3 1968 3 ... 1968 15 Jun 16 1968 16 Jun 17 1968 17 Jun 18 1968 18 Jun 19 1968 19 Jun 20 1968 20 Jun 21 1968 21 Jun 22 1968 22 Jun 23 ...
... repeated awakenings. ''(NAS Release; Schmeck, NYT, 6/26/68, 41; NAS-NRC-NAE News Report, 6-7/68, 1)''
NASA awarded $36,271,376 three-year cost ... -year term expiring June 30, 1969. ''(PD, 7/1/68, 1012-3)''
U.S patent No. 3,390,336 was issued to Dr. Michael J. DiToro, Vice ... Jun 16 1968 16 Jun 17 1968 17 Jun 18 1968 18 Jun 19 1968 19 Jun 20 1968 20 Jun 21 1968 21 Jun 22 1968 22 ...
... combined systems tests would continue through mid-July on Lunar Module 3. In Apollo spacecraft loading tests, drogue parachutes would be tested within ... W Star, 7/11/68, A5; UPI, NYT, 7/12/68, 7; SBD, 7/12/68, 41; GSFC SSR, 7/15/68, 7/31/68)''
Soviet Stalin Prize physicist, Prof ... 16 1968 16 Jul 17 1968 17 Jul 18 1968 18 Jul 19 1968 19 Jul 20 1968 20 Jul 21 1968 21 Jul 22 1968 ...
... NAR injector for lunar mission had not yet been made. ''(MSC Release 68-41)''
June 4-28: Seventh session of Legal Subcommittee of U.N. ... as adviser. ''(NASA Hq, 10/14/68)''
June 1968 June
Jun 1 1968 1 Jun 2 1968 2 Jun 3 1968 3 Jun 4 1968 4 Jun 5 ... Jun 16 1968 16 Jun 17 1968 17 Jun 18 1968 18 Jun 19 1968 19 Jun 20 1968 20 Jun 21 1968 21 Jun 22 1968 ...
... Saturn IB program. ''(SFC Release 68-41)''
DOD awarded $456-million cost-plus-incentive-fee contract to Lockheed Missiles & Space Co. for development and production of Poseidon ''(C-3)'' missile system, making definite ... million. About $1.2 billion would be spent through 1971. ''(UPI Release 230-68; AP, NYT, 3/13/68, 8)''
AFSC Aeronautical Systems Div. awarded Bendix Corp. $677,500 initial increment to ... 1968 15 Mar 16 1968 16 Mar 17 1968 17 Mar 18 1968 18 Mar 19 1968 19 Mar 20 1968 20 Mar 21 1968 21 Mar 22 1968 22 Mar 23 ...
Additional database time was 0.035 sec.
Result page: | 1 | 2 | 3 | 4 | 5 |
Powered by Sphinx