Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 1—10 of 422 matches for query "3.22.250.25" retrieved in 0.002 sec with these stats:

  • "3" found 42922 times in 14882 documents
  • "22" found 32762 times in 13178 documents
  • "250" found 1313 times in 1259 documents
  • "25" found 32858 times in 13147 documents



... passed H.R. 10456, authorizing $5,246,293,250 budget for NASA in FY 1965. Included in this amount was $52 ... the engines. ''(NASA Release 64-150)'' First manned Gemini space flight ( GT-3 ) was scheduled for late December, MSC public affairs official Ben Gillespie ... 20 1964 20 Jun 21 1964 21 Jun 22 1964 22 Jun 23 1964 23 Jun 24 1964 24 Jun 25 1964 25 Jun 26 1964 26 Jun 27 ...
... aboard the Space Shuttle Discovery , scheduled for flight from February 3 to 11, 1994: mission commander, Charlie Bolden; pilot, Ken Reightler; ... of Small and Disadvantaged Businesses (SDB) in setting aside $250 million and searching the country for the top 30 minority ... 20 Jan 21 1994 21 Jan 22 1994 22 Jan 23 1994 23 Jan 24 1994 24 Jan 25 1994 25 Jan 26 1994 26 ...
... Calif. The firing was the fourth static test within two months. The 250-ton rockets were being developed for the first stage of the ... ''(m, NYT, 12/23/64, 28)'' SN launched a Polaris A-3 -the 13th consecutive success-from the submerged submarine Von Steuben off ... 1964 20 Dec 21 1964 21 Dec 22 1964 22 Dec 23 1964 23 Dec 24 1964 24 Dec 25 1964 25 Dec 26 1964 26 Dec 27 ...
... -month airframe contract extension was $1 million ($750,000 Government, $250,000 contractor) ; dollar amount of each one-month engine contract extension ... admittedly knotty problems can be aired... " (Hotz, Av, Wk, 5/3/65, 11)'' Discussions at last week's Eurospace meeting in ... 20 May 21 1965 21 May 22 1965 22 May 23 1965 23 May 24 1965 24 May 25 1965 25 May 26 1965 26 May ...
... surveys for 59 days before undocking for a safe return to earth Sept. 25. July 28-31: Skylab 3 (SL-3) lifted off on time at 7:11 am EDT from Kennedy Space ... Workshop might have contributed to the motion sickness. The milder nausea experienced on the May 25-June 22 Skylab 2 mission could have been caused by a more gradual transition into the ... at 3:50. The service propulsion system engine made the deorbit maneuver at 5:38 pm EDT and the CM splashed down upside down at 6:20 pm EDT 400 km (250 ...
... -resolution spectral data from pointed experiments in 1 A-1,250 A range during one solar rotation and conduct raster scans ... March 7, 1962) and Orbiting Solar Observatory OSO II (launched Feb. 3, 1965) had surpassed their six-month design lifetimes and, together, ... 1969 20 Jan 21 1969 21 Jan 22 1969 22 Jan 23 1969 23 Jan 24 1969 24 Jan 25 1969 25 Jan 26 1969 26 Jan ...
... been possible., That, of course, is what government is about." ''(PD, 3/10/69, 341-2)'' NASA announced selection of 38 scientists ... December rather than June. Announcement followed successful test flight during which 250-ton aircraft reached complete stop on 1,500 ft of ... 1969 20 Feb 21 1969 21 Feb 22 1969 22 Feb 23 1969 23 Feb 24 1969 24 Feb 25 1969 25 Feb 26 1969 26 Feb ...
... computer would weigh considerations before opening appropriate escape exits. Patent No. 3,456,445 was issued to Curtiss-Wright Corp. for improved ... below and fueled from propane tank on pilot's back. At 250°F, hot air kept parachute above ground for 30 min. System ... 1969 20 Jul 21 1969 21 Jul 22 1969 22 Jul 23 1969 23 Jul 24 1969 24 Jul 25 1969 25 Jul 26 1969 26 Jul 27 ...
... ." ''(PD, 10/1/73, 1197)'' The Skylab 3 astronauts rested aboard recovery ship U.S.S. New Orleans following their splashdown see July 28-Sept. 25 . Dr. James C. Fletcher , NASA Administrator ... placed more than 250 pay-loads in earth orbit. Of all these, the mission that we completed today will perhaps prove to be the most fruitful of all." Skylab 3 had proved ... 19 Sep 20 1973 20 Sep 21 1973 21 Sep 22 1973 22 Sep 23 1973 23 Sep 24 1973 24 Sep 25 1973 25 Sep 26 1973 26 Sep 27 1973 27 Sep ...
... ground instrumentation to measure booms and boom effect. ''(FAA Release 64-3)'' Interviewed in Boston Globe, Dr. Albert J. Kelley, Director of Electronics ... 2,100 in 1969. Year-by-year buildup: 1964, 50; 1965, 250; 1966, 550; 1967, 1,000; 1968, 1,600; and 1969, 2, ... 1964 20 Feb 21 1964 21 Feb 22 1964 22 Feb 23 1964 23 Feb 24 1964 24 Feb 25 1964 25 Feb 26 1964 26 Feb 27 ...

Additional database time was 0.042 sec.


Result page: 1  2  3  4  5  6  7  8  9  10  Next 
 
Search in namespaces:

















Powered by Sphinx
Views