Search wiki using Sphinx
From The Space Library
Displaying 1—10 of 1000 matches for query "COURIER_1-B" retrieved in 0.007 sec with these stats:
- "courier" found 29 times in 26 documents
- "1" found 54409 times in 16881 documents
- "b" found 5432 times in 3343 documents
Image:Courier1B.jpg 200px
Courier 1B satellite
Category:Spacecraft
... a U.S. House request, could lead to changes in the planned mix of 100 B-1 B bombers and something over 100 Advanced Technology Bombers (ATBs-Stealth), Defense Daily reported. The new ... July 19/85)
Marshall Space Flight Center ( MARSHALL SPACE FLIGHT CENTER MSFC ) announced that July 1 marked the center's 25th anniversary. MARSHALL SPACE FLIGHT CENTER MSFC currently managed a budget ...
... included the N1 three-stage rocket and L3 lunar complex.
Image:N-1B.jpg N-1 B block the second stage of the N1 rocket.
Image:N-1V.jpg N ... assembly in the assembly building, ready for roll-out to the launch area.
Image:N-1-L3onway.jpg The N1-L3 system on the way to the launching complex.
Image:N ... launch pad
Image:N1-L3erector2.jpg N1-L3 being hoisted on the erector.
Image:N-1-L3erectonpad.jpg N1-L3 system is erected vertically on the launcher.
Image:N-1pad.jpg ...
... performed after normal working hours, the move was to be completed by Nov. 1. ''(Marshall Star, 9/2/64, 1, 12)''
In honor of RANGER VII , the International Astronomical Union meeting in ... -for-Peace Conference in Geneva. ''(LA. Times-Wash. Post Serv., Louisville Courier-Journal, 9/2/64)''
September 1964 September
Sep 1 1964 1 Sep 2 1964 2 Sep 3 1964 3 Sep 4 ...
... part of their ATS system.
Image:CSS2015-VincentFig1.jpg 300px
''FIGURE 1: ADS-B Coverage in Canada'' 1
Worldwide coverage by terrestrial aircraft tracking systems is limited by the location of ground stations ... port that typically runs the Angstrőm Linux distribution (Figure 3). Throughput of the ADS-B receiver is 1,700 messages per second. The time of reception and power of each ADS ...
... of the Journal of the British Interplanetary Society for Volumes 1 through 5 (Pre- World War 2)
Volume 1
January 1934
Retrospect & Prospect Philip Ellaby Cleator P.E. Cleator 2
... 28
List of New Members 29
Advertising 30
October 1934
Interplanetary Societies J.G. Strong B. Sc. 33
Editorial Philip Ellaby Cleator P.E. Cleator 34
A Mistake of the Antagonists ...
... Infobox Spacecraft
Name = '''''Morelos-B'''''
Image = Image:Morelos-B_STS-61-B.jpg 200px Organization = Secretariat of Comm., Mexico (Mexico),National Aeronautics and Space Administration (United States) ... =1985-109B Here PDMP Information = http://nssdc.gsfc.nasa.gov/nmc/experimentSearch.do?spacecraft=Morelos-B Here Telecommunications Information = http://nssdc.gsfc.nasa.gov/nmc/datasetSearch.do?spacecraft=Morelos ...
Image = Image:Morelos-B_STS-61-B.jpg 200px Organization = Secretariat of Comm., Mexico (Mexico),National Aeronautics and Space Administration (United States) ... =1985-109B Here PDMP Information = http://nssdc.gsfc.nasa.gov/nmc/experimentSearch.do?spacecraft=Morelos-B Here Telecommunications Information = http://nssdc.gsfc.nasa.gov/nmc/datasetSearch.do?spacecraft=Morelos ...
... can think of.
'''Ross-Nazzal:''' What did you learn from the first mission, from Alan B. Shepard Jr. ’s mission?
'''Kehlet:''' Well, that was kind of interesting. Alan wanted a parachute ... contracts, so if you won A, then you had to win B, and then we had to win B Prime, and then B Double Prime, and then finally C, which was the hardware ... the maximum cross range we’ve ever had on the Shuttle? It was designed for 1,200 miles cross range. Four hundred and fifty miles. Now, since the thermal protection goes ...
... ; James H. Schrader, LaRC, $1,500; Jesse M. Madey and Xopher W. Moyer, GSFC, $1,500 shared; James B. Newman, FRC, $1,200; Hershel M. Nance, MSFC, $1,000; Lee B. Malone, Charles E. David, and Harold R. Lowery, MSFC, $1,000 shared; and Frank L. Clark, Charles B. Johnson, Wayne D ...
... -the Defense Systems Acquisition Committee-held its first meeting to consider production of the controversial B-1 bomber and scheduled another meeting for 6 Jan. 1977 to decide on consolidation of cruise ... Air Force advocacy of an air-launched missile that could be used only with a B-1 or B-52 bomber, this restraint offered the verification possibility, acceptable to the USSR, of controlling ...
Additional database time was 0.092 sec.
Result page: | 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | Next |
Powered by Sphinx