Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 1—10 of 31 matches for query "MPLM" retrieved in 0.000 sec with these stats:

  • "mplm" found 41 times in 32 documents

Above numbers may include documents not listed due to search options.


... final Space Shuttle mission. The mission's primary cargo was the Multi-Purpose Logistics Module (MPLM) Raffaello and a Lightweight Multi-Purpose Carrier (LMC). The Multi-Purpose Logistics Module ... 2011 at 09:55 UT. EVA Payload ISS Resupply Mission ULF7; Multi-purpose Logistics Module (MPLM) Rafaello; Lightweight Multi-Purpose Carrier (LMC) Projected launch date is July 2011, with Atlantis (OV ...
... STS-105 crew delivered the Expedition 3 crew, attached the Leonardo Multi-Purpose Logistics Module (MPLM) and transferred more than 2.7 metric tons of supplies and equipment to the ISS ... 45 minutes of EVA time. Forrester served as the prime robotics operator to install the MPLM. STS-105 also brought home the Expedition 2 crew. The STS-105 mission was accomplished ... at the orbital outpost, the STS-128 crew rotated an expedition crewmember, attached the Leonardo MPLM and transferred more than 18,000 pounds of supplies and equipment to the ISS. The ...
... STS 135/ULF7, an ISS cargo delivery mission that carried the Multi Purpose Logistics Module (MPLM), "Raffaello." She became Deputy Chief, Astronaut Office, in September 2012. Dr. Magnus left the agency ... ,000 miles. STS-135 /ULF7 Atlantis (July 8 to July 21, 2011) carried the Raffaello MPLM to deliver supplies, logistics and spare parts to the station. The mission also flew a ... robotics officer and worked with pilot Doug Hurley to install the Multi-Purpose Logistics Module (MPLM) on the space station and supported the spacewalk. STS-135 was the 33rd flight of ...
... to the International Space Station ISS the Multi-Purpose Logistics Module ( Multi-Purpose Logistics Module MPLM ), which contained racks for experiments, stowage, and resupply. The crew would also install a component ... service the International Space Station ISS 's robotic arm. Both the Multi-Purpose Logistics Module MPLM and the MBS were part of the payload of the mission, also designated International Space ...
... STS-135 /ULF7, a station cargo delivery mission that carried the Multi Purpose Logistics Module (MPLM), "Raffaello." The crew of STS-135 was in training from September 2010 until the launch ... Earth orbits. STS-135 /ULF7, Atlantis (July 8 to July 21, 2011) carried the Raffaello MPLM to deliver supplies, logistics and spare parts to the International Space Station . The mission also ...
... containers and placed in the multi payload logistics module (MPLM) for return to Earth at the end of the mission. The MPLM is used to bring supplies and science racks to the ...
... carried, for the first time, the Leonardo Multi-Purpose Logistics Module ( Multi-Purpose Logistics Module MPLM ). The Italian Space Agency had constructed the module to serve as a “moving van” for ...
... -built, 9,000-pound (4,100-kilogram) Multi-Purpose Logistics Module ( Multi-Purpose Logistics Module MPLM ) called Leonardo to deliver supplies to the International Space Station ISS . Leonardo would deliver six ...
... payload was contained in an Italian-built Multi-Purpose Logistics Module ( Multi-Purpose Logistics Module MPLM ) called Raffaello . In addition, Endeavour carried a host of scientific payloads, including some experiments created ...
... Station ISS from Endeavour ’s mid-deck and from the Raffaello Multi-Purpose Logistics Module MPLM . The mission’s total duration had been 11 days, 19 hours, and 55 minutes. ''(NASA ...

Additional database time was 0.038 sec.


Result page: 1  2  3  4 
 
Search in namespaces:

















Powered by Sphinx
Views