Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 1—10 of 1000 matches for query "Saturn_C-1" retrieved in 0.006 sec with these stats:

  • "saturn" found 3342 times in 1515 documents
  • "c" found 7866 times in 4374 documents
  • "1" found 54409 times in 16881 documents



The C-1 was a large rocket proposed by the Canadian Rocket Society in August/September of 1948. ... with the design for the power plant, CRS Rocket 1, created by Kurt Richard Stehling . A six-foot tall model of the C-1 was exhibited at the Canadian National Exhibition in the ... Willy Ley in his September 1949 book Conquest of the Moon . Image:1949-10-CRS-C-1.jpg border 200px Category:Launch Vehicle
... Nevada. NASA announced that a two-stage Saturn C-1 will be used for the first 10 research and development flights. June 1961 June Jun 1 1961 1 Jun 2 1961 2 Jun 3 1961 ...
... 6.5-year 2-millionmile journey would be crossing September 1 through belts of unknown material beyond the ring systems around Saturn that had been visible from Earth, during which Pioneer would ... September 6 that the three Soviet satellites that had stopped transmitting September 1-2 for the benefit of Pioneer's Saturn flyby were early-warning satellites designed to detect U.S. ballistic ... . (NY Times, Sept 2179, 1; Sept 3/79, A-1; Sept 4/79, C-1; Sept 7/79, A-1; W Post, Sept 1/79, A-3; Sept 2/79, A-1; Sept 5/79, A-10 ...
... design a building that "couldn't possibly hold" all it was meant to display; the Saturn V rocket measured 4 times as high as the building, and a Boeing 747 fuselage ... May 76; W Star, 25 June 76, C-1; 1 July 76, A-1; W Post, 27 June 76, E-1; 1 July 76, B-1; 2 July 76, A-1; NYT, 2 July 76, B12; 4 July 76, 22; C Trib, 2 July 76, 4-16; Newport News (Va ...
... ship for 127 minutes. (FBIS, Moscow, Tass in English, Mar 1/82, Mar 2/82; NY Times, Mar 2/82, C-1; W Post, Mar 2/82, A-10) NASA announced the crews ... and the ground. Commander would be Paul J. Weitz , 49, who was pilot on Skylab 1 ; copilot would be U.S. Air Force Col. Karol J. Bobko , 44, another rookie. Donald ... ; W Post, Mar 2/82, A-9) February 1982 February March 1982 March Mar 1 1982 1 Mar 2 1982 2 Mar 3 1982 3 Mar 4 1982 4 Mar 5 1982 ...
... the management of the program from both the NASA Headquarters Washington, D.C. point of view and the Center point of view was such that ... the Saturn IB, not the Saturn V. In other words, it was a two-stage rocket, but it was made up of a previous Saturn I and Saturn ... the switch panel. We got hundreds of switches. I think there were 1,000 switches in the Command/Service Module. You didn't use them ...
... Moon on 8, we had to use the Saturn V, and we had had some problems with the Saturn V. But there was enough confidence in the ... lunar landing? '''Bostick:''' Well, I think, let me go back to Apollo 1. You know, at the end of Gemini we were pretty confident that ... this, what we're talking about there, I worked for Jim James C. Fletcher when he was the administrator in the early seventies. At his ...
... Center MSFC awarded McDonnell Douglas Corp. a $496,024 contract to study advanced versions of Saturn Saturn IVB S-IVB orbital workshop. Study would explore concepts for a follow-on workshop for the Uprated Saturn I and several more sophisticated versions for the Saturn V , with initial emphasis on uses of the stage in Apollo ... of the Industrial College of the Armed Forces in Washington, D.C. ''(AFSC Release 103.67)'' July 1967 July Jul 1 1967 1 Jul 2 1967 2 Jul 3 1967 3 Jul 4 ...
... $260 million. Achievements during first eight years included development and successful flight of Saturn I, Saturn IB, and Saturn V launch vehicles. ''(MSFC Release 68-143)'' McDonnell Douglas Corp. received $9 ... engines. Both extensions covered July 1, 1968, through June 30, 1969. ''( NASA Release 68-116; FRC Release 19-68)'' At signing in Washington, D.C., of nuclear nonproliferation treaty, ...
... carrying sample scooper near huge crater. ''(NYT, 5/2/72, 1, 28)'' Dismantling of Saturn Launch Complexes 34 and 37, sites of Saturn I and IB launches at start of Apollo program, was ... Appointment of Owen G. Morris as Manager, Apollo Spacecraft Program, was announced by Dr. Christopher C. Kraft , Jr., Manned Spacecraft Center Director. Morris, former manager for lunar module in program ...

Additional database time was 0.142 sec.


Result page: 1  2  3  4  5  6  7  8  9  10  Next 
 
Search in namespaces:

















Powered by Sphinx
Views