Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 1—10 of 1000 matches for query "Vehicle_Assembly_Building_Opening_Tour_1964" retrieved in 0.005 sec with these stats:

  • "vehicl" found 10011 times in 4664 documents
  • "assembl" found 2286 times in 1589 documents
  • "build" found 4756 times in 2364 documents
  • "open" found 3208 times in 1828 documents
  • "tour" found 1096 times in 737 documents
  • "1964" found 13995 times in 1108 documents



File:64 VAB opening tour.wav.mp4 Category:Audio
... opened perfectly. But parasail failed to deploy properly after its nylon lines snapped, and engineers had to trigger the reserve ringsail parachute to lower the vehicle ... buildings of the Kennedy Space Center, NASA, the Saturn Vertical Assembly Building ...
... Mar­shall Space Flight Center for Saturn launch vehicle test program. Con­tract called for ... Perini Corp, for construction of Inc., V-Apollo assembly building at Cape Kennedy . ''(NYT, 1/17/64, 32; ... 1964 22 Jan 23 1964 23 Jan 24 1964 24 Jan 25 1964 25 Jan 26 1964 26 Jan 27 1964 27 Jan 28 1964 28 Jan 29 1964 29 Jan 30 1964 30 Jan 31 1964 31 February 1964 ...
... Mars, and establish spacecraft and launch vehicle requirements. ABL would incorporate several life ... estimated 80% of workers on the Vertical Assembly Building for Project Apollo and the launch complex ... 1964 21 Jun 22 1964 22 Jun 23 1964 23 Jun 24 1964 24 Jun 25 1964 25 Jun 26 1964 26 Jun 27 1964 27 Jun 28 1964 28 Jun 29 1964 29 Jun 30 1964 30 July 1964 ...
... in support of the Saturn/Apollo launch vehicle program With cost estimated at $68 million for ... for space projects, including construction on an assembly building for the Saturn V lunar rocket, and work ... 1964 10 Dec 11 1964 11 Dec 12 1964 12 Dec 13 1964 13 Dec 14 1964 14 Dec 15 1964 15 Dec 16 1964 16 Dec 17 1964 17 Dec 18 1964 18 Dec 19 1964 19 Dec 20 1964 ...
... , malfunction detection system, structural heating and environmental control system, structural dynamics, and vehicle assembly documentation. ''(M&R, 1/4/65, 10)''

National Weather Satellite ... 1964 10 Dec 11 1964 11 Dec 12 1964 12 Dec 13 1964 13 Dec 14 1964 14 Dec 15 1964 15 Dec 16 1964 16 Dec 17 1964 17 Dec 18 1964 18 Dec 19 1964 19 Dec 20 1964 ...
... building a network of large-scale engineering facilities, space-yards, proving grounds, and space ports to assemble, test, and launch the space vehicles ... that the realm of space now opening up to us shall be ... 1964 21 Apr 22 1964 22 Apr 23 1964 23 Apr 24 1964 24 Apr 25 1964 25 Apr 26 1964 26 Apr 27 1964 27 Apr 28 1964 28 Apr 29 1964 29 Apr 30 1964 30 May 1964 ...
... .S. for assembly and launch ... systems. At opening session, ... Vehicle Engineering Laboratory since 1956, was appointed chief engineer of Saturn launch vehicle ... U.S. for speaking tour, Sir Bernard Lovell , ... 1964 22 Mar 23 1964 23 Mar 24 1964 24 Mar 25 1964 25 Mar 26 1964 26 Mar 27 1964 27 Mar 28 1964 28 Mar 29 1964 29 Mar 30 1964 30 Mar 31 1964 31 April 1964 ...
... were the $7.8 million operations and checkout building for the Gemini and Apollo spacecraft , and ... shield were expected to arrive at Cape soon. Assembled vehicle, to form core of Titan III-C , was ... 1964 22 Jul 23 1964 23 Jul 24 1964 24 Jul 25 1964 25 Jul 26 1964 26 Jul 27 1964 27 Jul 28 1964 28 Jul 29 1964 29 Jul 30 1964 30 Jul 31 1964 31 August 1964 ...
... vehicle and continued development of technology necessary to build the more powerful Saturn IB and V launch vehicles ... to 15,000 ft., where parachute opened for remaining portion of descent. ''( AP, Phil. ... 1964 22 May 23 1964 23 May 24 1964 24 May 25 1964 25 May 26 1964 26 May 27 1964 27 May 28 1964 28 May 29 1964 29 May 30 1964 30 May 31 1964 31 June 1964 ...

Additional database time was 0.040 sec.


Result page: 1  2  3  4  5  6  7  8  9  10  Next 
 
Search in namespaces:

















Powered by Sphinx
Views