Aug 1 1988
From The Space Library
(Difference between revisions)
RobertG (Talk | contribs)
(New page: A Wet Countdown Demonstration Test (WCDT) of the Space Shuttle Discovery's External Tank (ET) was conducted following several unplanned holds as a result of problems with ground su...)
Newer edit →
Current revision
A Wet Countdown Demonstration Test (WCDT) of the Space Shuttle Discovery's External Tank (ET) was conducted following several unplanned holds as a result of problems with ground support equipment. The WCDDT, carried out with Discovery deployed for launch at the Kennedy Space Center's Launch Complex 39-B, consisted of loading the ET with liquid Oxygen and Liquid Hydrogen in mock preparation for a Shuttle launch. (NASA STS-26 Press Kit)
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31