Oct 7 1983

From The Space Library

Revision as of 04:03, 10 February 2010 by RobertG (Talk | contribs)
(diff) ←Older revision | Current revision (diff) | Newer revision→ (diff)
Jump to: navigation, search

NASA said that prelaunch processing for STS-9 would include removal of the OV-102 waste-management system and replacement with the system from OV-099. The job would take place after the completion of a launch-confidence test that included a wet-countdown demonstration, hot-fire testing of propellant units, and operation of the fuel-cell power systems. (NASA Dly Acty Rpt, Oct 7/83)

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31