Aug 24 1961

From The Space Library

Revision as of 02:58, 12 September 2009 by RobertG (Talk | contribs)
(diff) ←Older revision | Current revision (diff) | Newer revision→ (diff)
Jump to: navigation, search

NASA announced decision to launch manned lunar flights and other missions requiring Saturn and Nova class vehicles from expanded Cape Canaveral facilities. Based upon national space goals announced by the President in May, NASA plans call for acquisition of 80,000 acres north and west of AFMTC, to be administered by the USAF as agent for NASA and as a part of the Atlantic Missile Range. Decision followed intensive NASA-DOD survey for launching facilities, including trajectory advantages, overflight or booster impact hazards, air and water transportation, instrumentation support, and cost, time, and land availability advantages. Expansion of Cape Canaveral was noted as first of three major steps in accelerating the U.S. space program, the remaining two steps being a manned space flight research center, and a booster fabrication and test facility.

Mercury-Atlas 4 launch postponed.

NORAD charts showed that flight of Vostok II was tracked continuously.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31