Search wiki using Sphinx

From The Space Library

Jump to: navigation, search

Displaying 1—10 of 1000 matches for query "STS-9" retrieved in 0.004 sec with these stats:

  • "st" found 7180 times in 2129 documents
  • "9" found 37303 times in 13928 documents



... Infobox Spacecraft Name = '''''STS-9'''''
Image = Image:sts-9.jpg 200px Organization = NASA-Office of Space Science Applications (UnitedStates),NASA-Office of Space Flight ( ... Orbital_Period = Apoapsis = Periapsis = Orbits = Alternate Names = Spacelab 1/STS 9,14523 Experiments = http://nssdc.gsfc.nasa.gov/nmc/experimentSearch.do?spacecraft=STS%20%20%209/Spacelab%201 Here Nominal Power = Additional Information ...
... the dominant issue at the five-week World Administrative Radio Conference that would open August 9 in Geneva, the NY Times reported. The meeting was intended to negotiate a plan to ... with mission specialist Owen Garriott conducted in 1983 on STS-9 was generally credited as the genesis for the current SAREX. (Lewis News, Aug 9/85, 1) July 1985 July August 1985 August ... 1985 5 Aug 6 1985 6 Aug 7 1985 7 Aug 8 1985 8 Aug 9 1985 9 Aug 10 1985 10 Aug 11 1985 11 Aug 12 1985 12 Aug 13 ...
... included the Shuttle Solar Backscatter Ultraviolet Experiment (SSBUV-8) (previously flown on STS-34, STS-41, STS-43, STS-45, STS-56, STS-62 and STS-66), EDFT-03, Shuttle Laser Altimeter Payload (SLA-01/GAS(5 ... , Space Tissue Loss Experiment (STL/NIH-C), Pool Boiling Experiment (PBE) (hardware previously flown on STS-47, STS-57 and STS-60) and the Thermal Energy Storage (TES-2) experiment (previously flown on ... for a total of 13 hours, 2 minutes. EVA 1, Chiao and Barry, 6 hours, 9 minutes; Chiao and Barry evaluated a new EVA workstation, a movable stanchion that provides stability ...
... Name = '''''STS-106'''''
Image = Image:sts-106.jpg 200px Organization = NASA-Office of Space Flight (United States) Major_Contractors = Mission_Type = Human Crew Satellite_Of = Launch = Start date 2000 9 8 Launch ... = Periapsis = Orbits = Alternate Names = 26489 Experiments = http://nssdc.gsfc.nasa.gov/nmc/experimentSearch.do?spacecraft=STS%20106 Here Nominal Power = Additional Information = http://nssdc.gsfc.nasa.gov/nmc/spacecraftOrbit.do?id ...
... = Orbits = Alternate Names = 28775 Experiments = http://nssdc.gsfc.nasa.gov/nmc/experimentSearch.do?spacecraft=STS%20114 Here Nominal Power = Additional Information = http://nssdc.gsfc.nasa.gov/nmc/ ... far, a few (probably) minor damages to the tiles have been identified. EPILOG,9 Sep 2005: The shuttle safely landed in Edwards Air Base near Los ...
... = '''''STS-115'''''
Image = Image:sts-115.jpg 200px Organization = NASA-Office of Space Flight (United States) Major_Contractors = Mission_Type = Human Crew,Resupply/Refurbishment/Repair Satellite_Of = Launch = Start date 2006 9 9 ... 2: '''ISS/Mir Crew Transport''' Mission STS 115 is an American Shuttle craft that was launched from Cape Canaveral at 15:15 Ut on 9 September 2006. It transported six astronauts to ...
... 4: Mission Specialist 5: Payload Specialist 1: Payload Specialist 2: '''ISS/Mir Crew Transport''' Mission STS 57 was the 56th shuttle mission and the fourth flight of the Endeavour orbiter. ... has been cleared. The orbiter completed 155 orbits and had a total duration of 9 days, 23 hours, 44 minutes, and 54 seconds. EVA Extravehicular Activity (EVA) conducted by ...
... Name = '''''STS-64'''''
Image = Image:sts-64.jpg 200px Organization = NASA-Office of Space Flight (United States) Major_Contractors = Mission_Type = Human Crew Satellite_Of = Launch = Start date 1994 9 9 Launch_Vehicle ... = Periapsis = Orbits = Alternate Names = 23251 Experiments = http://nssdc.gsfc.nasa.gov/nmc/experimentSearch.do?spacecraft=STS%20%2064 Here Nominal Power = Additional Information = http://nssdc.gsfc.nasa.gov/nmc/spacecraftOrbit.do ...
... = '''''STS-69'''''
Image = Image:sts-69.jpg 200px Organization = NASA-Office of Space Flight (United States) Major_Contractors = Mission_Type = Human Crew,Life Science,Microgravity Satellite_Of = Launch = Start date 1995 9 ... = Alternate Names = OV-105,23667 Experiments = http://nssdc.gsfc.nasa.gov/nmc/experimentSearch.do?spacecraft=STS%20%2069 Here Nominal Power = Additional Information = http://nssdc.gsfc.nasa.gov/nmc/spacecraftOrbit.do ...
... Name = '''''STS-79'''''
Image = Image:sts-79.jpg 200px Organization = NASA-Office of Space Flight (United States) Major_Contractors = Mission_Type = Human Crew Satellite_Of = Launch = Start date 1996 9 16 Launch ... approximately four-month stay was Mission Specialist John E. Blaha who returned with the STS 81 crew. STS 79 marked the second flight of the SPACEHAB module in support of the Shuttle ...

Additional database time was 0.049 sec.


Result page: 1  2  3  4  5  6  7  8  9  10  Next 
 
Search in namespaces:

















Powered by Sphinx
Views